Don't Carry That Problem Into 2027

A field guide for the last 30 working days of 2026

Updated 16 min readMarkdown
Don't Carry That Problem Into 2027

Read full blog: https://www.trueleansolutions.com/insights/dont-carry-that-problem-into-2027/

The 30-second read

Most problems that last a year are not technically hard. They were described as a solution, their cost was never added up, or they looked too big to start.

  • Write the problem in one sentence without naming any technology, then ask "why?" until you reach the cause.
  • Put a yearly cost on it. That number tells you whether to act now and caps what the fix should cost.
  • Climb a six-step ladder from "remove the step" to "build custom software" and stop at the first step that works.
  • For product ideas and AI, start smaller than feels comfortable. Small, well-defined projects are the ones that succeed.

Every December, a familiar line gets copied from one year's plan into the next. "Fix the order process." "Get the systems talking." "Build the client portal." "Figure out AI."

If you lead a growing business, you probably have one of these. It has survived budget meetings, a few vendor demos and at least one "let's revisit this next quarter." Don't carry it into 2027. This guide shows you how to solve business problems like that one in the time left before the year ends, or at least how to start January knowing exactly what the problem is, what it costs and what the fix should be.

It is written for founders, CEOs and operations leaders who don't have a technology leader on staff. It is the same method we use with clients at True Lean Solutions, laid out so you can run it yourself.

Starting Monday, November 16, there are about 30 working days left in 2026 once Thanksgiving and Christmas are taken out. That is not enough time to transform a business. It is enough to end one problem that has cost you all year.

Why some business problems survive a whole year

When a problem has lasted twelve months, it is rarely because it is technically difficult. In our experience it survives for one of three reasons.

1. It was written down as a solution

"We need a new CRM." "We need an app." "We need AI." Each of these describes a purchase, not a problem. Once a problem is phrased as a product, every conversation turns into a vendor comparison, and nobody checks whether the product would have fixed anything.

2. Its cost is spread thin

Ten minutes of re-keying here, a status meeting there, a spreadsheet someone rebuilds every Friday afternoon. No single loss is big enough to force a decision, but together they add up.

Asana's Anatomy of Work research, based on a survey of more than 10,000 knowledge workers, found that people spend about 60% of their time on "work about work": chasing updates, searching for information and switching between apps. Very little of that shows up as a line in anyone's budget, so very little of it gets fixed.

3. It looks too big to start

A problem that seems to need a big project waits for a big budget and a quiet quarter. Neither arrives. Yet small projects are the ones that work. The Standish Group has tracked software project outcomes since 1994, and its 2015 CHAOS data found small projects were at least ten times more likely to succeed than large ones.

So the job is to make the problem specific, put a price on it, and shrink it to something you can start. The five steps below do that.

Step 1: Define the problem without naming a technology

Clear problem definition is the foundation of any business process improvement for small business. Skip it and every later decision rests on a guess.

Write a one-sentence problem statement

Use this template:

[Who] spends [time or money] on [what] because [cause], and the result is [consequence].

Example: Our three account managers each spend about six hours a week copying orders from email into the ERP, because the two systems do not share order data, and the result is late confirmations and a full day a week lost to rework.

This sentence does not mention a CRM, AI, a platform or an app, and that is deliberate. If you cannot write the problem without naming a solution, you have not defined it yet.

Use the 5 Whys to find the root cause

The 5 Whys is a root cause analysis technique that came out of Toyota's production system and sits at the centre of Lean thinking. Ask "why?" about five times, or until you reach a cause you can fix.

Question Answer
What's the problem? "We need a new CRM."
Why? Sales can't see where an order is.
Why? Order status lives in the ERP, and sales works in the CRM.
Why does that matter? Someone copies updates between them by hand.
Why is that a problem? It happens late or not at all, so customers get wrong answers.
Root cause The two systems don't share order status.

The business does not need a new CRM. It needs two systems that share one piece of data. That fix can be small.

Get agreement before moving on

Read the sentence to the people who live with the problem every day. If they say "that's it, exactly," you have it. If they correct it, you have learned something. Fix the wording, then move on.

Step 2: Calculate what the problem costs

A problem with a cost attached gets decided. A problem without one gets discussed.

The formula

Annual cost = hours lost per week x people affected x hourly cost including benefits x 48 working weeks, plus the cost of errors, plus the cost of delays.

A worked example

The figures below are illustrative. Replace them with your own.

Input Example value
People affected 4
Hours lost per person per week 5
Hourly cost including benefits $40
Working weeks per year 48
Annual labor cost $38,400
Errors per month x cost per error 6 x $150
Annual error cost $10,800
Total annual cost $49,200

What the number tells you

It tells you two things:

  1. Whether to act now. A $49,000-a-year problem deserves attention before January. A $3,000-a-year problem may not.
  2. What the fix should cost. As a rule of thumb, if the fix costs more than one or two years of the problem, look for a smaller fix first.

You will not get the number exactly right, and you do not need to. A cautious estimate your team believes is enough, and measuring the cost of manual data entry this way also gives you a baseline to prove the fix worked later.

Step 3: Choose the lightest fix that will hold

Most leaders jump straight to building or buying something. Climb this ladder instead, and stop at the first step that works.

Step Fix When it fits Typical signal
1 Remove the step The work adds no value Reports nobody reads, approvals nobody refuses
2 Set up what you already own Your current tools can do it Features you pay for but don't use
3 Connect your systems Data exists but sits in the wrong place The same data typed into two or more tools
4 Automate the workflow The process is right but repetitive Copy, paste, check, send, repeat
5 Build custom software Your workflow really differs from what tools assume Workarounds stacked on workarounds
6 Add people What's missing is skill or capacity The right process with nobody to run it

Why you start at the bottom

Lean thinking says to remove waste before you automate it. Automating a broken process just produces the wrong result faster.

System integration for small business: an example

A logistics client of ours ran six platforms that did not talk to each other. Staff spent more than 20 hours a week typing data between them, and 73% of items fell into a manual entry process with all the mistakes that brings. A single integration was enough to remove the manual step, cut the error rate to near zero, and remove about $3 million a year in cost.

That was step three. If your team types the same data into more than one tool, read our perspective on building custom integrations and when to connect instead of replace.

Workflow automation: an example

A professional services firm managed its projects across email, spreadsheets and tools that did not connect. Its people were effectively spending their weeks as couriers between systems. Simple workflow automation gave them a consistent process instead: intake, approvals, scheduling, invoicing. It removed 15 hours a week of handoffs and took onboarding from three days to four hours. It also made the firm safer to scale, because the same process could be repeated for every new client without adding staff.

Build vs buy software: how to decide

When you reach step five, this is the question that matters.

Buy off-the-shelf when Build custom when
Your process is standard for your industry Your process is part of how you win
A tool covers 80% or more of what you need Every tool forces workarounds
You can change your process to fit the tool Changing the process would cost you customers or margin
Speed matters more than fit Off-the-shelf costs grow with every user or transaction

Being honest about this question protects your budget. Sometimes the right answer is the tool you can buy tomorrow. Our article on when a home-grown ERP beats an off-the-shelf platform covers the other side.

Step 4: If it's a product idea, test the riskiest assumption first

Many founders end the year with a software product they still have not built. It is tempting to start with the build. That is usually the wrong place to start.

Why most products fail

CB Insights has studied startup post-mortems for years. "No market need" is consistently the most cited reason startups fail, appearing in 35% of post-mortems originally and in 42% of the updated study. The reason has not changed in a decade: people build something nobody asked for.

A practical approach to MVP development

  1. Name the assumption that would sink the idea. Usually it is one of these: People will pay for this. People will change how they work to use it. We can reach buyers at a cost that makes sense.
  2. Test it as cheaply as you can. Talk to 15 to 20 likely buyers. Show them a clickable prototype. Or run the service by hand for ten customers and see what actually happens.
  3. Map what the product must do before anyone estimates it. We once helped define a platform from a blank page: no specification, no team, only a market thesis. The first job was not code. It was to turn that thesis into something the whole team could build.
  4. Define version one by what it must prove. An MVP with one feature that proves demand beats one with twenty features that proves nothing.
  5. Decide the hard rules early. Who can see what, how money moves, what must be auditable. These are much cheaper to build in from the start than to add later.

The last weeks of a year are a good time to validate an idea and scope phase one properly. Starting to build in December, with a vague brief and a holiday deadline, is a much worse time.

Step 5: If it's AI, start with one workflow

AI for small business is the most common item on year-end lists right now, and the numbers show why it gets stuck.

Trying AI is common. Running on it is not.

  • A Goldman Sachs 10,000 Small Businesses survey of 1,256 owners, fielded in early 2026, found 76% already use AI in some form. Yet 73% said they would benefit from training.
  • Thryv's 2026 survey of 561 small and mid-sized business decision-makers put adoption at 66%, up from 55% a year earlier.
  • The U.S. Census Bureau's Business Trends and Outlook Survey uses a stricter measure. It put the share of businesses using AI in production at around 17% by the end of 2025, rising to 20% by May 2026.

The gap between trying AI and depending on it is where most businesses are stuck.

Your team may have already decided for you

Verizon's 2026 Data Breach Investigations Report found that 45% of employees now regularly use AI tools on work devices, three times the share a year earlier, and that about two-thirds of that use runs through personal accounts rather than company-provided tools. If your team is already using AI, the question is not whether to use it. The question is whether you govern it.

Data comes before models

Large organizations face the same problem at a bigger scale. In MuleSoft's 2025 Connectivity Benchmark Report, 95% of IT leaders said integration is a hurdle to implementing AI effectively. If your systems do not share clean data, AI has nothing reliable to work with. That is why steps one to three come before step five.

Good first AI workflows

Workflow Input Output What to measure
Meeting follow-up Recorded calls Minutes, decisions and action items Time from meeting to follow-up email
Invoice processing Supplier invoices Entries in the accounting system Hours per month, error rate
Lead handling Website and email inquiries A qualified lead record with a summary Response time
Internal Q&A Policies and procedures Answers with the source linked Questions sent to managers

An AI starter checklist

  • Pick one workflow with a clear input and a clear output.
  • Decide where data is allowed to go before you choose a tool.
  • Write a one-page AI usage policy your team can follow.
  • Give people an approved tool instead of a ban. Bans push AI use out of sight.
  • Make sure the tool has access rules and keeps a record of who used it.
  • Measure one thing for 30 days: hours saved, turnaround time or error rate.

If keeping data inside your own environment matters to you, see how we approach private, governed AI.

A week-by-week plan for the rest of the year

Starting Monday, November 16, there are about 30 working days left in 2026 once Thanksgiving and Christmas are taken out. Use them like this:

Week Dates Focus Output
1 Nov 16 to 20 Define and price One-sentence problem statement, annual cost
2 Nov 23 to 25 Decide Step on the ladder chosen, owner named
3 to 5 Nov 30 to Dec 18 Fix or validate One integration, one automation, or a tested product assumption
6 Dec 21 to 23 Hand over Process documented, team trained
7 Dec 28 to 31 Review Results measured against the step 2 baseline, Q1 scope written

Realistic before the holidays

  • A problem statement your leadership team agrees on
  • A cost estimate and a budget ceiling for the fix
  • One connection between two systems, or one automated workflow
  • An AI usage policy and a pilot with one team
  • Repairing an internal tool that broke and was never fixed

That last item is more common than you would think. A wellness business we work with relied on a stock-taking tool that broke. Every workaround cost time and money. We repaired it and added proper product catalogues. It took days, and the cost of delay had been accumulating for months.

Better left for Q1, with the plan finished this year

  • A full custom platform or product build
  • Replacing a core system such as an ERP
  • A company-wide AI rollout

Five mistakes that keep problems alive

  1. Automating a broken process. Fix the process first, or you will get the wrong result faster.
  2. Buying software to solve a communication problem. If two teams don't agree on a handoff, a new tool won't make them agree.
  3. Building the whole product at once. Scope phase one around what it must prove.
  4. Banning AI instead of governing it. People will use it anyway, just where you can't see it.
  5. Leaving the problem without an owner. A problem shared by everyone is owned by no one. Put one name next to it.

If a previous attempt already failed, our article on why software implementations fail explains the usual non-technical causes.

Year-end problem-solving checklist

Answer these with your leadership team in one sitting:

  • What is the one problem we have carried longest this year?
  • Can we describe it in one sentence without naming a technology?
  • What did the 5 Whys reveal as the root cause?
  • Who feels it most, and how many hours a week does it cost them?
  • Using a cautious estimate, what does it cost per year?
  • What is the lowest step on the ladder that would fix it?
  • What can we finish in the remaining working days of the year?
  • What will we measure to know it worked?
  • Who owns it, by name?

If the last question has no answer, that is probably why the problem made it through the year.

Get the free field guide

Want to work through this with your leadership team instead of reading it on a screen? Download "Don't Carry That Problem Into 2027: The Field Guide", a free PDF version of this guide, laid out to print and fill in at one sitting. It includes the problem statement template, the 5 Whys worksheet, the annual cost calculator, the six-step fix ladder, the build vs buy table, the AI starter checklist, the week-by-week plan to December 31, and the full year-end checklist.

Sources

Asana, Anatomy of Work Index. Standish Group, 2015 CHAOS. CB Insights, startup post-mortems. Goldman Sachs 10,000 Small Businesses. Thryv, 2026 survey. U.S. Census Bureau, Business Trends and Outlook Survey. Verizon, 2026 Data Breach Investigations Report. MuleSoft, 2025 Connectivity Benchmark Report.

Read full blog: https://www.trueleansolutions.com/insights/dont-carry-that-problem-into-2027/

About the author

  • True Lean Solutions (TLS) is a technology partner for growing businesses. We don't start with technology. We start with the problem. TLS builds custom software, connects systems, automates workflows and puts private AI to work, then stays to make sure the fix works. Results: 73% less manual data entry for a logistics client; 15 hours a week removed for a professional services firm. Led by CEO Mack Akhani, headquartered in Hurst, Texas, with delivery teams in India. Lean Thinking. Real Results. https://www.trueleansolutions.com | Follow us: instagram.com/trueleansolutions | facebook.com/trueleansolutions | x.com/trueleansol